Pueblo Levee Dredging & Maintenance Project
Project Details
- Project Channel Length: 8,700 feet
- Total Project Cost: $5.2 Million
- Completion: September 2017










Project Summary
The Pueblo Levee Dredging & Maintenance Project restored approximately 8,700 feet of Fountain Creek from East 8th Street to its confluence with the Arkansas River. Completed in partnership with the City of Pueblo, the project reduced flood risk by removing accumulated sediment and invasive vegetation that had reduced the creek's capacity to safely convey floodwaters.
To meet maintenance requirements for the U.S. Army Corps of Engineers' levee system, the project lowered the creek bed by approximately three feet, removed invasive species—including Phragmites, Russian olive, and tamarisk—and removed two abandoned railroad bridge piers that restricted flow. Approximately 127,000 cubic yards of sediment were dredged and hauled offsite, with 55,000 cubic yards repurposed for City of Pueblo projects, including improvements at Lake Minnequa Park and Plaza Verde.
Why This Project?
Over time, sediment buildup and invasive vegetation reduced the capacity of Fountain Creek and increased flood risk for nearby neighborhoods and infrastructure. By restoring channel capacity, maintaining the U.S. Army Corps of Engineers' levee system, and removing flow restrictions, the project improved flood protection, supported long-term creek maintenance, and enhanced the function of the Fountain Creek corridor.