Highway 47 Bank Restoration Project
Project Details
- Bank ID Number: PC109
- Project Channel Length: 3,000 feet
- Total Project Cost: $6.0 million (District: $4.5 million, CDOT: $1.5 million)
- Completion: November 2018








Project Summary
The Highway 47 Bank Restoration Project restored approximately 3,000 feet of Fountain Creek upstream of the Highway 47 bridge in Pueblo. Following the June 2015 flood, the creek shifted east toward the bridge, increasing erosion, channel instability, and the risk of damage to critical transportation infrastructure.
Completed in partnership with the Colorado Department of Transportation (CDOT), the project restored a more stable channel by realigning the creek, protecting bridge abutments with riprap, constructing a guide bank to improve flow through the bridge, and restoring native vegetation. These improvements reduce erosion and sediment loading, protect the Highway 47 bridge, and enhance the health of the riparian corridor.
Why This Project?
The 2015 flood significantly altered the channel upstream of the Highway 47 bridge, increasing erosion and threatening the stability of the bridge. By restoring a more natural channel alignment, stabilizing streambanks, and improving flow through the bridge crossing, the project reduces flood risk, protects critical infrastructure, improves water quality, and creates a healthier, more resilient Fountain Creek corridor.